CountyNC
Posted
Sep 21, 2026
Oct 22, 2026
PERIMETER FENCE PROJECT at the ASHE COUNTY AIRPORT RFP
This RFP is for sealed bids for the PERIMETER FENCE PROJECT at the ASHE COUNTY AIRPORT.
Description: Provide a correctional facility security construction project involving guard tower relocation and perimeter fence modifications. Includes erecting pre-engineered guard tower on new foundations, installing security fencing systems with gates and access controls, concrete sidewalks, asphalt pavement, and electrical systems.
StateAgency · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from New York State Office of General Services.
Adjacent opportunities open for bidding right now.
CountyNC
Posted
Sep 21, 2026
Oct 22, 2026
This RFP is for sealed bids for the PERIMETER FENCE PROJECT at the ASHE COUNTY AIRPORT.
FederalNY
Posted
Oct 9, 2026
Oct 23, 2026
The work is installation of approximately 327 linear feet of new 7-foot-tall chain-link fence with 2-inch mesh and 9-gauge aluminized material. It is a total small-business-set-aside solicitation for the Watervliet Arsenal in Watervliet, New York. The PIEE posting lists a primary RFQ and wage-determination attachment, and the offer deadline is October 23, 2026, at 11:00 a.m. EDT.
Bureau of Engraving and Printing
FederalDC
Posted
-
Nov 9, 2026
Demolition and replacement of two existing Evapco cooling towers (Model: AT 424-936), replacement of one BAC cooling tower (model number is VXT-800CR from Baltimore air coil company, Serial number is 84-5979) associated structural steel platform, roofing replacement, associated structural components, associated mechanical components, associated electrical components, pump, motors, piping, chemical feed, fire/smoke detector system, condenser water motor/pumps, electrical circuit breaker, piping insulation, SCADA integration, and associated control systems. Contractor should ensure that the project adheres to all guidelines and code, including but not limited to, the International Plumbing Code (IPC), the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) standard and guideline, the American Society of Mechanical Engineers (ASME) codes and standards and the National Electrical Code, etc.
New York State Office of General Services
State AgencyNY
Posted
Jun 17, 2026
Oct 21, 2026
Project encompasses construction of a new national guard division headquarters building.