School DistrictNV
Posted
Sep 14, 2026
Oct 20, 2026
Description: This RFP is for construction services for the design and installation of a backflow preventer at Antonello ES, including the removal and replacement of an 8-inch backflow device and the addition of a concrete pad and cover.
SchoolDistrict · NV, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Clark County School District.
These related opportunities are still open for bidding.
School DistrictNV
Posted
Sep 14, 2026
Oct 20, 2026
Procurement for the replacement of existing underground fuel storage and dispensing systems and the construction of a new temporary above-ground fuel storage and dispensing area, including associated site paving, utility, electrical, lighting, and fuel management improvements.
Higher EducationOH
Posted
Oct 2, 2026
Oct 23, 2026
Seeking proposal for backflow preventer testing.
CountyIL
Posted
-
Oct 30, 2026
Will County seeks sealed proposals to install a fourth landfill-gas feed compressor at its Prairie View Landfill renewable natural gas plant in Wilmington, Illinois. Proposals are to be submitted to the Will County Purchasing Department, and the bid requires a 10% bid bond; electronic bidding is unavailable. Proposals are due October 30, 2026, at 12:00 p.m. Central Time.
FederalDC
Posted
Oct 15, 2026
Oct 30, 2026
The General Services Administration’s Federal Acquisition Service is soliciting a vendor to install components on a 2026 Ford F-350 in Loveland, Colorado, with standard manufacturer warranties required. The work includes a Warn 12K winch and front bumper, cab-length running boards, an enclosed steel utility body with specialized storage, lighting and central locking, a Class 5 hitch rated for at least 18,000 pounds, and a backup camera. Vendors must follow industry, EPA and OSHA requirements, maintain proper insurance and valid licenses, keep required safety documents on site, and pay employees according to local Department of Labor wages.