Northeast Ohio Regional Sewer District
Special DistrictOH
Posted
Sep 22, 2026
Oct 23, 2026
Easterly Headworks Bar Rake and Bar Screen Rehabilitation Project RFP
Easterly headworks bar rake and bar screen rehabilitation project.
Description: The scope of this project includes the installation of owner- furnished equipment consisting of two (2) flow isolation gates, two (2) automatic cleaning mechanical bar screens, one (1) automatic screenings screw conveyor, and associated control panel(s) at water reclamation facility.
SpecialDistrict · AR, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Northeast Ohio Regional Sewer District
Special DistrictOH
Posted
Sep 22, 2026
Oct 23, 2026
Easterly headworks bar rake and bar screen rehabilitation project.
Fraser Valley Regional District
CountyBC
Posted
Oct 8, 2026
Oct 28, 2026
The Fraser Valley Regional District is seeking proposals for the supply, installation, testing, and commissioning of an integrated ventilation system for the fire engine bay at Boston Bar Fire Hall 1.
Posted
Sep 30, 2026
Oct 26, 2026
The U.S. Army Corps of Engineers–New England District issued a pre-solicitation notice for furnishing equipment, materials, and labor to install approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam in Mansfield, Connecticut. The anticipated construction magnitude is $25,000 to $100,000, and the procurement is set aside for small businesses under NAICS 237310. This is not yet a request for quotes; the solicitation documents, submission instructions, and response date were expected to be available on or about October 16, 2026.
Federal Highway Administration
FederalDC
Posted
Oct 16, 2026
Oct 23, 2026
The intended part is modeled after the EVANS pattern DF-1 Dunnage Bar, which is used to secure heavy cargo and equipment inside boxcars. The bars are telescoping on one end, allowing the overall length to vary between approximately 107” – 115”. The steel beam exhibits a “Z”-shaped 8-gauge steel cross section with ½” returns, bolted between two oak wood bars. Each end is fitted with a cast metal head and a pinned locking latch. Material: Steel and oak wood. See attached file.